Skip to main content
Please contact the Booth Family Center for Special Collections for assistance with accessing these materials.

Page 56., 12/25/1875-12/25/1875

 File — Box: 1, Folder: 3
Identifier: 55826

Series-level Scope and Content Note

From the Series:

(Folder 3) Contains the third folio of the scrapbook, pp.41-60.

Dates

  • 12/25/1875-12/25/1875

Collection-level Access Restrictions

Most manuscripts collections at the Georgetown University Booth Family Center for Special Collections are open to researchers; however, restrictions may apply to some collections. Collections stored off site require a minimum of three days for retrieval. For use of all manuscripts collections, researchers are advised to contact the Booth Family Center for Special Collections in advance of any visit.

Extent

From the Collection: 0.5 Linear Feet (1 box)

Language of Materials

From the Collection: English

Container Summary

Contains news item(s) bearing the following headline(s): @ The New Viaduct - How a Railroad Builds a Bridge - The New Market Street Bridge Constructed in Two Hundred and Seven Working Hours - Fastest Bridge-building Time on Record... (12/25/1875). @ Pencil diagram in fragments probably by William Wright re canal excavation (unlabelled, undated).

Subjects and Associated Physical Materials

PENNSYLVANIA RAILROAD COMPANY & MARKET STREET BRIDGE P.56: Printed Item

WRIGHT, WILLIAM W.: PANAMA CANAL EXCAVATION DIAGRAM P.56: Graphic Image

PANAMA CANAL - EXCAVATION DIAGRAM BY WILLIAM W. WRIGHT P.56: Graphic Image

Repository Details

Part of the Georgetown University Manuscripts Repository

Contact:
Lauinger Library, 5th Floor
37th and O Streets, N.W.
Washington DC 20057