Page 3., 05/29/1879-08/10/1880
Series-level Scope and Content Note
(Folder 1) Contains the first folio of the scrapbook, pp.1-20. Pages 1a and 1b are blank.
Dates
- 05/29/1879-08/10/1880
Collection-level Access Restrictions
Most manuscripts collections at the Georgetown University Booth Family Center for Special Collections are open to researchers; however, restrictions may apply to some collections. Collections stored off site require a minimum of three days for retrieval. For use of all manuscripts collections, researchers are advised to contact the Booth Family Center for Special Collections in advance of any visit.
Extent
From the Collection: 0.5 Linear Feet (1 box)
Language of Materials
From the Collection: English
Container Summary
Contains news items bearing the following headlines: @ The Wyse Project Adopted in Committee (New York Herald, 5/29/1879). @ ...Scheme Declared Impracticable [Partially obscured headline] (8/14/1879). Includes reference to John C. Trautwine, chief engineer for the construction of the Panama Railroad. Criticizes de Lessep's plan to build a canal without locks. @ The Rival Canal Routes (8/10/1880).
Subjects and Associated Physical Materials
WYSE, LUCIEN N.B. - ISTHMUS CANAL SEA LEVEL ROUTE P.3: Other Types
TRAUTWINE, JOHN C. - CRITICIZES DE LESSEPS P.3: Other Types
INTEROCEANIC CANAL: ROUTES P.3: Printed Item
Repository Details
Part of the Georgetown University Manuscripts Repository
Lauinger Library, 5th Floor
37th and O Streets, N.W.
Washington DC 20057
speccoll@georgetown.edu